Product Information:
Not only can the type foldable container be used for accommodation, office, or storage, but it can also be used for different purposes such as showers, kitchens, bathrooms, etc. The foldable container house is installed very quickly on site. Three people can build a single box of finished products in just half an hour, and up to 14 sets of boxes can be transported by single vehicle, reducing transportation costs and saving time.
Details:
Standard size: 5900*2600*2440mm
Configuration: 1 security door, 2 Windows, 1 switch, 2 lamps, 2 ordinary sockets, 1 air conditioning socket, 1 leakage protector, 1 air switch
Service life: more than 20 years
Manufacturing cycle: 7-10 days
Personnel required for installation: 3
Installation and scalability: Quick folding design, easy and quick installation, suitable for emergency needs. Small size after folding, easy to transport and storage. Transport costs are low. It does not support large-scale expansion, mainly for monomer use, and later transformation is more difficult.
Structure and material: steel frame, aluminum alloy structure, sandwich board (rock wool board, polyurethane board, etc.). Foldable, easy to transport and store, easy to disassemble and assemble.
Application scenarios and features: temporary office, dormitory, mobile sales point, construction site dormitory, etc. Easy to transport and store, quick to build.
Economy and environmental protection: Low cost, fast construction, suitable for short-term projects. Energy-saving design, recyclable materials, in line with environmental standards.
Installation Instructions:
step1: Hoisting and Positioning | step2: Unfolding and Fixing | step3: Accessory Installation | step4: Final Inspection and Tidy-up |
Use a forklift/crane to transport the container body to a flat and even area, place it securely, and then prepare for unfolding | Unlock the top and bottom fasteners, lift the top to unfold, flip down the floor, pull up the walls and secure them
| Insert doors and windows into their respective holes, tighten screws, install weatherstripping, and add electrical circuits and water pipes as needed
| Check if the structure is secure, the walls are aligned, and the doors and windows operate smoothly
|

| 
| 
| 
|